Installation of Vacuum Circuit Breaker
Installation of ABB vacuum circuit breaker at the Boac Diesel Power Plant of the National Power Corporation last May 20, 2015.
Installation of ABB vacuum circuit breaker at the Boac Diesel Power Plant of the National Power Corporation last May 20, 2015.
Installation, commissioning and testing of fuel consumption monitoring system at the Lubang Diesel Power Plant of the National Power Corporation last April 18, 2015.
Installation of Rhosonics density meter at the Team Sual Corporation at Sual, Pangasinan last March 26, 2015.